We lead engineering and construction projects of industrial and energy plants, including operation and maintenance, with presence in the five continents

 

Innovative Solutions

  • Experts in engineering and construction of industrial facilities
  • Green Transition Vehicle
We offer a wide range of end-to-end and highly-innovative solutions. With over 1,600 professional staff, all of our projects and services are characterised by environmental protection, excellence, safety and social responsibility.
Portland cement plant in Oruro, Bolivia
Portland cement plant in Oruro, Bolivia
Industrial
  • REVENUE
    352
    Millions of euros
  • EBITDA
    23
    Millions of euros
  • GREEN REVENUES
    41.46%
  • BACKLOG
    679
    Millions of euros
WATER

TOP11

In the world in desalination of water

+3hm3

Of water treated

+300

Projects executed

+250

Specialist professionals

T&D AND RENEWABLES
  • "Turnkey" EPC and BOP projects for wind farms and large photovoltaic plants.
  • O&M for renewable energy plants Specialists in geothermal energy and generation using biomass.
  • EPC projects for medium and high voltage transmission lines.
  • BOOT projects and their financing Completion of the construction of three photovoltaic plants in Ciudad Real (Spain), a wind farm in Lugo (Spain)

+8

,000

Km of lines maintained

in-house

in solar, geothermal and biomass engineering

400 kV

Substations and electricity lines up to 400 kV

900

,000

Service to more than 900,000 people in LATAM

  • Construction and installation of two hydroelectric plants in Peru, worth 102 million euros, with the work scheduled for completion in 30 months.
  • Construction of two wind farms in Chile, amounting to 61 million euros.
  • Construction of a 5.6 MW geothermal pilot plant in "Laguna Colorada", Potosí (Bolivia), for a total amount of 15 million euros; these works are due to be completed in 24 months. Once complete, it will be the highest plant in the world of its kind (4,980 metres above sea level).
  • Disposal of a total of 9 generation and cogeneration plans in Spain, for the sum of 149 million euros, including associated debt, and a capacity of 125 MW, while continuing to operate and maintain all of these plants.
OIL & GAS

800

,000

Engineering capacity of hours/year

+7MM

Man-hours without an accident

3MM

Hours refinery maintenance

ISO 45001: 2018

New certification in Safety Management

Energy, Industry & Environment

+100

Cogeneration projects

+1 Million

Hours of operation

+450

Own engineering with +450 professional staff

+2 MM

Energy for +2 million homes

  • Construction, assembly and start-up of the building and facilities housing the primary crusher, conveyor belt and vehicle workshops for the copper mine in Quellaveco, in the region of Moquegua (Peru). These works, scheduled for completion in 24 months are worth a total of 44.6 million euros.
Unloading rails at the Uruguay Central Railway