Sacyr Engineering and Infrastructures

Business model

Sacyr Engineering and Infrastructures

 
Tlahuac Hospital. México
 

"Our infrastructures continue to be the benchmark in innovation, design and security as we work with the latest technologies

 

Infrastructure leader in all types of civil works projects

Revenue
2,074
Millions of euros
+21%
EBITDA
253
Millions of euros
+50%
Engineering and Infrastructures
  • BACKLOG
    7,134
    Million euros
    [+15%]
  • MONTHS OF ACTIVITY
    41
  • EBITDA MARGIN
    12.2%
    [+2,4 p.p.]

We imagine infrastructure that improves the quality of people's lives

Activity is focused on infrastructure projects. 81% of total activity
  • Focused on high-added value projects. 88% international
  • Extensive experience in projects with a high-level of technical and technological capacity.
  • Our international expansion model has to take into account the need for local deployment, taking advantage of both the ability we have demonstrated to compete with sector-leading companies in other countries as well as our peers, and our know-how in particular segments.
The Concepción-Cabrero highway (Bio Bio Valley).Chile
  • This year, Sacyr has commissioned the Pumarejo Bridge over the River Magdalena in the city of Barranquilla, Colombia. Measuring 2,173 metres in length, it will be one of the longest brace-stayed bridges in Colombia and the widest brace-stayed bridge in Latin America, measuring 38.1 metres in width.
Load test on the Pumarejo Bridge, Colombia
SACYR Informe

Download the full PDF version of the chapters in the Integrated Sustainability Report 2019

Download Center

Photo gallery